{"id":3027,"date":"2026-11-29T14:13:25","date_gmt":"2026-11-29T08:43:25","guid":{"rendered":"https:\/\/advmriduljindal.com\/blog\/law\/rera\/section-14-sanctioned-plans-structural-defects\/"},"modified":"2026-11-29T14:57:39","modified_gmt":"2026-11-29T09:27:39","slug":"section-14-sanctioned-plans-structural-defects","status":"publish","type":"page","link":"https:\/\/advmriduljindal.com\/blog\/law\/rera\/section-14-sanctioned-plans-structural-defects\/","title":{"rendered":"Section 14 RERA: No Changes to Sanctioned Plans Without Consent, and the Builder\u2019s Five-Year Liability for Structural Defects"},"content":{"rendered":"<style>.mjl-crumb{font-size:13px;color:#555;margin-bottom:12px}.mjl-crumb a{color:#1F3864}.mjl-qa{border-left:4px solid #0084e9;background:#f3f8fe;padding:14px 18px;border-radius:6px;margin:0 0 18px}.mjl-tw{overflow-x:auto;margin:10px 0 20px}.mjl-t{border-collapse:collapse;width:100%;font-size:14px}.mjl-t th{background:#1F3864;color:#fff;text-align:left;padding:8px;font-weight:600}.mjl-t td{border-bottom:1px solid #e3e9f2;padding:8px;vertical-align:top}.mjl-t tr:nth-child(even) td{background:#f7f9fc}.mjl-t td:first-child{white-space:nowrap;font-weight:600}.mjl-t tr.mjl-g td{background:#eaf0f8;color:#1F3864;font-weight:700}.mjl-hi{background:#fff8e6;border-radius:6px;padding:12px 16px;margin:0 0 18px}<\/style>\n<p class=\"mjl-crumb\"><a href=\"https:\/\/advmriduljindal.com\/\">Home<\/a> \u203a <a href=\"https:\/\/advmriduljindal.com\/blog\/law\/\">Law Library<\/a> \u203a <a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/\">RERA<\/a> \u203a Section 14<\/p>\n<div class=\"mjl-qa\">\n<p><strong>In short:<\/strong> Section 14 of the Real Estate (Regulation and Development) Act, 2016 requires the promoter to develop the project <strong>according to the sanctioned plans and specifications<\/strong>. Changes to an allottee\u2019s apartment need that allottee\u2019s <strong>written consent<\/strong>, and other alterations to the building need the consent of <strong>at least two-thirds of the allottees<\/strong>. Under Section 14(3), if any <strong>structural defect<\/strong> or defect in workmanship, quality or services is brought to the promoter\u2019s notice <strong>within five years from possession<\/strong>, the promoter must rectify it <strong>within 30 days without charge<\/strong>, failing which the allottee can claim compensation.<\/p>\n<\/div>\n<p class=\"mjl-hi\" lang=\"hi\"><strong>\u0939\u093f\u0902\u0926\u0940 \u092e\u0947\u0902:<\/strong> \u0927\u093e\u0930\u093e 14 \u0930\u0947\u0930\u093e: \u0938\u094d\u0935\u0940\u0915\u0943\u0924 \u0928\u0915\u094d\u0936\u0947 \u092e\u0947\u0902 \u092c\u0926\u0932\u093e\u0935 \u0915\u0947 \u0932\u093f\u090f \u0906\u0935\u0902\u091f\u0940 \u092f\u093e \u0926\u094b-\u0924\u093f\u0939\u093e\u0908 \u0906\u0935\u0902\u091f\u093f\u092f\u094b\u0902 \u0915\u0940 \u0938\u0939\u092e\u0924\u093f; \u0915\u092c\u094d\u091c\u0947 \u0915\u0947 \u092a\u093e\u0901\u091a \u0935\u0930\u094d\u0937 \u0915\u0947 \u092d\u0940\u0924\u0930 \u0938\u0902\u0930\u091a\u0928\u093e\u0924\u094d\u092e\u0915 \u0926\u094b\u0937 \u092c\u093f\u0932\u094d\u0921\u0930 30 \u0926\u093f\u0928 \u092e\u0947\u0902 \u092e\u0941\u092b\u094d\u0924 \u0920\u0940\u0915 \u0915\u0930\u0947\u0964<\/p>\n<h2>Section 14 RERA at a glance<\/h2>\n<div class=\"mjl-tw\">\n<table class=\"mjl-t\">\n<thead>\n<tr>\n<th>Provision<\/th>\n<th>What it says (summary)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>14(1)<\/td>\n<td>Develop and complete the project according to sanctioned plans, layout and specifications.<\/td>\n<\/tr>\n<tr>\n<td>14(2)(i)<\/td>\n<td>Additions or alterations to an apartment need the allottee\u2019s prior written consent (minor changes excepted).<\/td>\n<\/tr>\n<tr>\n<td>14(2)(ii)<\/td>\n<td>Other alterations to sanctioned plans of the building need consent of at least two-thirds of the allottees.<\/td>\n<\/tr>\n<tr>\n<td>14(3)<\/td>\n<td>Structural defects or defects in workmanship, quality or services notified within five years of possession: rectify within 30 days at no charge, or pay compensation.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"font-size:13px;color:#666\">The table summarises the provisions in plain English. For the exact words and the State rules (UP RERA, Delhi RERA), see the Act on <a href=\"https:\/\/www.indiacode.nic.in\/\" rel=\"nofollow noopener\" target=\"_blank\">India Code<\/a>.<\/p>\n<h2>Defects after possession<\/h2>\n<p>Leakage, cracks, poor-quality fittings and non-working lifts or fire systems are common complaints. Give the builder written notice with photographs. If not rectified within 30 days, file a complaint before the Authority or claim compensation before the adjudicating officer. See the guide on <a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/sections-71-72-adjudicating-officer-compensation\/\">compensation under Sections 71 and 72<\/a>.<\/p>\n<h2>Changes to common areas<\/h2>\n<p>Using green areas, parking or common areas for new towers or commercial use without two-thirds consent of allottees is a breach of Section 14(2)(ii). Residents usually act through their association; see <a href=\"https:\/\/advmriduljindal.com\/rwa-apartment-owners-association-dispute-lawyer-ghaziabad.php\">RWA and AOA disputes<\/a>.<\/p>\n<div data-exp=\"1\"><\/div>\n<h2>What counts as a structural defect<\/h2>\n<p>Section 14(3) covers structural defects and any other defect in workmanship, quality or provision of services, or any other obligation of the promoter under the agreement, brought to the promoter\u2019s notice within five years from the date of handing over possession. The promoter must rectify it without further charge within 30 days; if it fails, the allottee is entitled to appropriate compensation. Seepage and leakage, cracks in walls and beams, faulty plumbing and wiring, defective lifts and fire systems, and sub-standard materials compared with the brochure are common examples. The five-year period runs from the handing over of possession to the allottee.<\/p>\n<h2>Changes to plans and common areas<\/h2>\n<p>Under Section 14(2), after the plans and specifications are disclosed, the promoter cannot make additions or alterations to the apartment without the allottee\u2019s previous written consent, except minor additions or alterations that are required or permitted for architectural or structural reasons. Any other alteration to the sanctioned plans, layout plans and specifications of the building or the common areas needs the previous written consent of at least two-thirds of the allottees, other than the promoter. Adding a tower in an open green area, or converting a park or parking area, therefore needs that consent in addition to the authority\u2019s sanction.<\/p>\n<h2>Step by step: getting defects fixed<\/h2>\n<ol>\n<li>Record each defect with dated photographs and, if possible, an engineer\u2019s report.<\/li>\n<li>Send a written notice to the promoter listing the defects and asking for repair within 30 days.<\/li>\n<li>Keep a copy of the acknowledgment or delivery proof.<\/li>\n<li>If not fixed, file a complaint before RERA for rectification, and before the adjudicating officer for compensation.<\/li>\n<li>Where many flats are affected, act through the association of allottees.<\/li>\n<\/ol>\n<h2>Common mistakes<\/h2>\n<ul>\n<li>Raising defects only orally with the site office.<\/li>\n<li>Waiting beyond five years from possession.<\/li>\n<li>Paying for repairs without notice to the promoter and then claiming the cost without proof of the defect.<\/li>\n<\/ul>\n<div data-exp=\"2\"><\/div>\n<h2>An example<\/h2>\n<p>Two years after possession, residents of a Noida society notice cracks in the basement columns and water seepage into several flats. The association commissions a structural engineer\u2019s report and sends it to the builder with a written demand to rectify within 30 days under Section 14(3). When the builder sends only a painter to cover the cracks, the association files a complaint before UP RERA for proper rectification and asks for an expert inspection. Individual flat owners with damage inside their homes file compensation claims before the adjudicating officer, supported by repair estimates and photographs.<\/p>\n<p style='font-size:13px;color:#666'>This example is illustrative only. The outcome in a real case depends on its documents, facts and the forum\u2019s view.<\/p>\n<h2>Need help?<\/h2>\n<p>If this affects your flat or project, the office of Adv. Mridul Jindal handles <a href=\"https:\/\/advmriduljindal.com\/rera-lawyer-noida.php\">RERA complaints<\/a> and <a href=\"https:\/\/advmriduljindal.com\/rwa-apartment-owners-association-dispute-lawyer-ghaziabad.php\">RWA disputes<\/a>. You can <a href=\"https:\/\/advmriduljindal.com\/contact.php\">contact us<\/a> for a consultation in person at Indirapuram or online.<\/p>\n<h2>Related sections<\/h2>\n<ul>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/section-11-duties-of-promoter\/\">Section 11 RERA<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/sections-71-72-adjudicating-officer-compensation\/\">Sections 71 and 72 RERA<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/section-31-complaint-to-rera\/\">Section 31 RERA<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/rera\/\">All sections of RERA<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>How long is the builder liable for structural defects?<\/h3>\n<p>Five years from the date of handing over possession, under Section 14(3).<\/p>\n<h3>How quickly must the builder fix a defect?<\/h3>\n<p>Within 30 days of being informed, without charge; otherwise the allottee can claim compensation.<\/p>\n<h3>Can the builder build an extra tower in our society?<\/h3>\n<p>Not by altering sanctioned plans without the consent of at least two-thirds of the allottees, under Section 14(2)(ii).<\/p>\n<h3>Do I need to give written notice of defects?<\/h3>\n<p>Yes, written notice with evidence is the best way to start the 30-day period and support a later complaint.<\/p>\n<h3>How long is a builder liable for defects under RERA?<\/h3>\n<p>For defects brought to its notice within five years from handing over possession, under Section 14(3). The builder must rectify within 30 days.<\/p>\n<h3>Can the builder change the layout of our society without consent?<\/h3>\n<p>Not beyond minor alterations. Other changes to the plans or common areas need the written consent of at least two-thirds of the allottees under Section 14(2).<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"How long is the builder liable for structural defects?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Five years from the date of handing over possession, under Section 14(3).\"}},{\"@type\":\"Question\",\"name\":\"How quickly must the builder fix a defect?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Within 30 days of being informed, without charge; otherwise the allottee can claim compensation.\"}},{\"@type\":\"Question\",\"name\":\"Can the builder build an extra tower in our society?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not by altering sanctioned plans without the consent of at least two-thirds of the allottees, under Section 14(2)(ii).\"}},{\"@type\":\"Question\",\"name\":\"Do I need to give written notice of defects?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, written notice with evidence is the best way to start the 30-day period and support a later complaint.\"}},{\"@type\":\"Question\",\"name\":\"How long is a builder liable for defects under RERA?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"For defects brought to its notice within five years from handing over possession, under Section 14(3). The builder must rectify within 30 days.\"}},{\"@type\":\"Question\",\"name\":\"Can the builder change the layout of our society without consent?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not beyond minor alterations. Other changes to the plans or common areas need the written consent of at least two-thirds of the allottees under Section 14(2).\"}}]}<\/script><\/p>\n<p style=\"font-size:13px;color:#666\"><em>Prepared by the office of Adv. Mridul Jindal. Last updated 29 November 2026. This page is general legal information, not legal advice for your specific case. Law and procedure change; please consult an advocate before acting.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Home \u203a Law Library \u203a RERA \u203a Section 14 In short: Section 14 of the Real Estate (Regulation and Development) Act, 2016 requires the promoter to develop the project according to the sanctioned plans and specifications. Changes to an allottee\u2019s apartment need that allottee\u2019s written consent, and other alterations to the building need the consent<\/p>\n","protected":false},"author":0,"featured_media":3673,"parent":3023,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-3027","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/comments?post=3027"}],"version-history":[{"count":2,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3027\/revisions"}],"predecessor-version":[{"id":3214,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3027\/revisions\/3214"}],"up":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/media\/3673"}],"wp:attachment":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/media?parent=3027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}