{"id":3433,"date":"2026-11-29T17:18:28","date_gmt":"2026-11-29T11:48:28","guid":{"rendered":"https:\/\/advmriduljindal.com\/blog\/law\/contract-act\/section-56-frustration-and-force-majeure\/"},"modified":"2026-11-29T17:18:28","modified_gmt":"2026-11-29T11:48:28","slug":"section-56-frustration-and-force-majeure","status":"publish","type":"page","link":"https:\/\/advmriduljindal.com\/blog\/law\/contract-act\/section-56-frustration-and-force-majeure\/","title":{"rendered":"Section 56 Indian Contract Act: Frustration, Impossibility and Force Majeure"},"content":{"rendered":"<style>.mjl-crumb{font-size:13px;color:#555;margin-bottom:12px}.mjl-crumb a{color:#1F3864}.mjl-qa{border-left:4px solid #0084e9;background:#f3f8fe;padding:14px 18px;border-radius:6px;margin:0 0 18px}.mjl-tw{overflow-x:auto;margin:10px 0 20px}.mjl-t{border-collapse:collapse;width:100%;font-size:14px}.mjl-t th{background:#1F3864;color:#fff;text-align:left;padding:8px;font-weight:600}.mjl-t td{border-bottom:1px solid #e3e9f2;padding:8px;vertical-align:top}.mjl-t tr:nth-child(even) td{background:#f7f9fc}.mjl-t td:first-child{white-space:nowrap;font-weight:600}.mjl-t tr.mjl-g td{background:#eaf0f8;color:#1F3864;font-weight:700}.mjl-hi{background:#fff8e6;border-radius:6px;padding:12px 16px;margin:0 0 18px}<\/style>\n<p class=\"mjl-crumb\"><a href=\"https:\/\/advmriduljindal.com\/\">Home<\/a> \u203a <a href=\"https:\/\/advmriduljindal.com\/blog\/law\/\">Law Library<\/a> \u203a <a href=\"https:\/\/advmriduljindal.com\/blog\/law\/contract-act\/\">Indian Contract Act<\/a> \u203a Section 56<\/p>\n<div class=\"mjl-qa\">\n<p><strong>In short:<\/strong> Section 56 of the Indian Contract Act, 1872 makes an agreement to do an impossible act void, and a contract becomes void when performance later becomes impossible or unlawful due to an event the promisor could not prevent. &#8220;Impossible&#8221; includes practical impossibility that destroys the basis of the contract, not mere hardship or a rise in cost. Force majeure clauses, where present, are applied first under Section 32.<\/p>\n<\/div>\n<p class=\"mjl-hi\" lang=\"hi\"><strong>\u0939\u093f\u0902\u0926\u0940 \u092e\u0947\u0902:<\/strong> \u0927\u093e\u0930\u093e 56: \u0905\u0938\u0902\u092d\u0935 \u0915\u093e\u0930\u094d\u092f \u0915\u0930\u0928\u0947 \u0915\u093e \u0938\u092e\u091d\u094c\u0924\u093e \u0936\u0942\u0928\u094d\u092f \u0939\u0948, \u0914\u0930 \u0905\u0928\u0941\u092c\u0902\u0927 \u0915\u0947 \u092c\u093e\u0926 \u0915\u094b\u0908 \u0910\u0938\u0940 \u0918\u091f\u0928\u093e \u091c\u093f\u0938\u0938\u0947 \u0915\u093e\u092e \u0905\u0938\u0902\u092d\u0935 \u092f\u093e \u0917\u0948\u0930\u0915\u093e\u0928\u0942\u0928\u0940 \u0939\u094b \u091c\u093e\u090f, \u0905\u0928\u0941\u092c\u0902\u0927 \u0915\u094b \u0936\u0942\u0928\u094d\u092f \u0915\u0930 \u0926\u0947\u0924\u0940 \u0939\u0948\u0964 \u0938\u093f\u0930\u094d\u092b \u0932\u093e\u0917\u0924 \u092c\u0922\u093c\u0928\u093e \u092f\u093e \u0915\u0920\u093f\u0928\u093e\u0908 \u0939\u094b\u0928\u093e \u092a\u0930\u094d\u092f\u093e\u092a\u094d\u0924 \u0928\u0939\u0940\u0902 \u0939\u0948\u0964 \u092b\u094b\u0930\u094d\u0938 \u092e\u0947\u091c\u094d\u092f\u094b\u0930 \u0936\u0930\u094d\u0924 \u0939\u094b \u0924\u094b \u092a\u0939\u0932\u0947 \u0909\u0938\u0940 \u0915\u094b \u0926\u0947\u0916\u093e \u091c\u093e\u0924\u093e \u0939\u0948\u0964<\/p>\n<h2>Key facts<\/h2>\n<div class=\"mjl-tw\">\n<table class=\"mjl-t\">\n<thead>\n<tr>\n<th>Provision<\/th>\n<th>What it says (summary)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Section 56, para 1<\/td>\n<td>An agreement to do an act impossible in itself is void.<\/td>\n<\/tr>\n<tr>\n<td>Section 56, para 2<\/td>\n<td>A contract to do an act which, after it is made, becomes impossible or unlawful by an event the promisor could not prevent, becomes void when the act becomes impossible or unlawful.<\/td>\n<\/tr>\n<tr>\n<td>Section 56, para 3<\/td>\n<td>A promisor who knew, or with reasonable diligence might have known, that the act was impossible or unlawful, and the promisee did not, must compensate the promisee for loss.<\/td>\n<\/tr>\n<tr>\n<td>Section 32<\/td>\n<td>Contracts contingent on an event happening (including force majeure clauses) are governed by the contract&#8217;s terms.<\/td>\n<\/tr>\n<tr>\n<td>Section 65<\/td>\n<td>When an agreement is discovered to be void or a contract becomes void, a person who received an advantage must restore it or compensate.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"font-size:13px;color:#666\">The table summarises the provisions in plain English. For the exact words, see the Indian Contract Act, 1872 on <a href=\"https:\/\/www.indiacode.nic.in\/handle\/123456789\/2187\" rel=\"nofollow noopener\" target=\"_blank\">India Code<\/a>.<\/p>\n<h2>What counts as frustration<\/h2>\n<p>In <em>Satyabrata Ghose v. Mugneeram Bangur<\/em> (1954), the Supreme Court held that &#8220;impossible&#8221; in Section 56 is not limited to physical or literal impossibility. A contract is frustrated when an unexpected event makes performance impracticable or useless from the point of view of the object the parties had in mind. On the facts, a temporary wartime requisition of land did not frustrate a contract to develop plots, because the delay did not destroy the basis of the bargain.<\/p>\n<p>Examples that may frustrate a contract: destruction of the subject matter, a change in law making performance illegal, death or incapacity in a personal-service contract, or government action that permanently prevents performance.<\/p>\n<h2>What is not frustration<\/h2>\n<ul>\n<li><strong>Higher costs or market changes:<\/strong> in <em>Energy Watchdog v. CERC<\/em> (2017), the Supreme Court held that an unexpected rise in the price of imported coal did not frustrate power purchase agreements, as the contract was not rendered impossible and the risk was a commercial one.<\/li>\n<li><strong>Self-induced events:<\/strong> a party cannot rely on an impossibility caused by its own act or default.<\/li>\n<li><strong>Foreseeable risks<\/strong> that the contract already allocates.<\/li>\n<\/ul>\n<h2>Force majeure clauses<\/h2>\n<p>Where the contract has a force majeure clause, it is applied first, as a contingent term under Section 32. Section 56 applies when the event falls outside the contract. Typical issues:<\/p>\n<ul>\n<li>Whether the event is listed, or falls within a general &#8220;beyond reasonable control&#8221; phrase.<\/li>\n<li>Whether the clause requires notice within a set time, and mitigation.<\/li>\n<li>Whether the clause only suspends obligations or allows termination after a period.<\/li>\n<\/ul>\n<p>The COVID-19 lockdown in 2020 produced many disputes; courts generally examined the specific clause and whether performance was actually prevented rather than merely made harder.<\/p>\n<h2>Consequences and refunds<\/h2>\n<p>When a contract becomes void, parties are released from future performance. Under Section 65, an advance or deposit received must be returned, and value received must be paid for. Section 56, para 3 adds a compensation claim where one party knew of the impossibility and the other did not.<\/p>\n<h2>Typical Delhi NCR situations<\/h2>\n<ul>\n<li>A Delhi banquet hall booking for a wedding is cancelled because a government order bans gatherings on the date. The contract may be frustrated, and the advance should be refunded under Section 65, subject to the booking terms.<\/li>\n<li>A Noida supplier claims frustration because raw material prices doubled. That alone is not frustration.<\/li>\n<li>A Ghaziabad landlord&#8217;s building is sealed by the authority for illegal construction. Whether the tenancy is frustrated depends on the duration and cause; if the landlord caused it, he cannot rely on it.<\/li>\n<\/ul>\n<h2>Step by step: responding to an event that stops performance<\/h2>\n<ol>\n<li>Read the force majeure clause and note its notice and mitigation requirements.<\/li>\n<li>Give written notice promptly, describing the event and its effect on performance.<\/li>\n<li>Record evidence that performance was actually prevented, not just costlier.<\/li>\n<li>Explore suspension or renegotiation before termination.<\/li>\n<li>If the contract is frustrated, account for advances and value received under Section 65.<\/li>\n<\/ol>\n<h2>Common mistakes<\/h2>\n<ul>\n<li>Invoking force majeure for a price rise or a cash-flow problem.<\/li>\n<li>Missing the notice period in the force majeure clause.<\/li>\n<li>Keeping advances after declaring the contract frustrated.<\/li>\n<li>Assuming a temporary disruption ends the contract permanently.<\/li>\n<\/ul>\n<h2>Need help?<\/h2>\n<p>If this affects your matter, the office of Adv. Mridul Jindal advises on <a href=\"https:\/\/advmriduljindal.com\/contract-drafting-lawyer.php\">contract drafting and review<\/a>, <a href=\"https:\/\/advmriduljindal.com\/commercial-suit-lawyer-delhi-high-court.php\">commercial suits<\/a>, <a href=\"https:\/\/advmriduljindal.com\/arbitration-lawyer-delhi.php\">arbitration<\/a> and <a href=\"https:\/\/advmriduljindal.com\/civil-lawyer-ghaziabad.php\">civil recovery and property disputes<\/a> in Delhi, Ghaziabad and Noida. You can <a href=\"https:\/\/advmriduljindal.com\/contact.php\">contact us<\/a> for a consultation in person at Indirapuram or online by WhatsApp video, Google Meet or phone.<\/p>\n<h2>Related guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/contract-act\/section-55-time-essence-of-contract\/\">Section 55: time as the essence<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/contract-act\/sections-73-75-damages-and-liquidated-damages\/\">Sections 73 to 75: damages<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/arbitration-act\/\">Arbitration Act guides<\/a><\/li>\n<li><a href=\"https:\/\/advmriduljindal.com\/blog\/law\/commercial-courts-act\/\">Commercial Courts Act guides<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is frustration of contract under Section 56?<\/h3>\n<p>It is when, after the contract is made, an event the promisor could not prevent makes performance impossible or unlawful, or destroys its basis. The contract then becomes void.<\/p>\n<h3>Is a sharp price increase a ground for frustration?<\/h3>\n<p>No. The Supreme Court held in Energy Watchdog v. CERC (2017) that a rise in costs does not frustrate a contract.<\/p>\n<h3>What is the difference between force majeure and frustration?<\/h3>\n<p>Force majeure is a contractual clause applied under Section 32. Frustration under Section 56 applies when the contract does not deal with the event.<\/p>\n<h3>Do I get my advance back if a contract is frustrated?<\/h3>\n<p>Generally yes. Section 65 requires a party who received an advantage under a contract that becomes void to restore it or compensate.<\/p>\n<h3>Can a party rely on an impossibility it caused?<\/h3>\n<p>No. Self-induced frustration is not a defence.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is frustration of contract under Section 56?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is when, after the contract is made, an event the promisor could not prevent makes performance impossible or unlawful, or destroys its basis. The contract then becomes void.\"}},{\"@type\":\"Question\",\"name\":\"Is a sharp price increase a ground for frustration?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. The Supreme Court held in Energy Watchdog v. CERC (2017) that a rise in costs does not frustrate a contract.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between force majeure and frustration?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Force majeure is a contractual clause applied under Section 32. Frustration under Section 56 applies when the contract does not deal with the event.\"}},{\"@type\":\"Question\",\"name\":\"Do I get my advance back if a contract is frustrated?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Generally yes. Section 65 requires a party who received an advantage under a contract that becomes void to restore it or compensate.\"}},{\"@type\":\"Question\",\"name\":\"Can a party rely on an impossibility it caused?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Self-induced frustration is not a defence.\"}}]}<\/script><\/p>\n<p style=\"font-size:13px;color:#666;margin-top:24px\"><em>Prepared by the office of Adv. Mridul Jindal. Last updated 29 November 2026. Case references checked against published reports. This page is general legal information, not legal advice for your specific case. Law and procedure change; please consult an advocate before acting.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Home \u203a Law Library \u203a Indian Contract Act \u203a Section 56 In short: Section 56 of the Indian Contract Act, 1872 makes an agreement to do an impossible act void, and a contract becomes void when performance later becomes impossible or unlawful due to an event the promisor could not prevent. &#8220;Impossible&#8221; includes practical impossibility<\/p>\n","protected":false},"author":1,"featured_media":3434,"parent":3415,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-3433","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/comments?post=3433"}],"version-history":[{"count":0,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3433\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/pages\/3415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/media\/3434"}],"wp:attachment":[{"href":"https:\/\/advmriduljindal.com\/blog\/wp-json\/wp\/v2\/media?parent=3433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}